Bottom Line Technologies Inc.   FPGA, Product, and System Design for Commercial, 
				Industrial, Military, and Aerospace Markets.  BLT designs incorporate FPGAs, DSP, PCI, and often FW
HOME  Site Map  CONTACT
Subscribe to eNewsletter
Email:
.
Philosophy
Design Philosophy 
Design Methodology 
Project Management 
Project Staffing 
 
 
 
 
 
Related Links
Ethics 
Axioms 
 
 
 
 
Technologies Design Services Outsourcing Company Philosophies Company Information
 
  HOME
  Philosophy 
Design Methodology
Step 1
Can BLT help?
BLT's core philosophy of “Acting in the best interest of the Client”  is  key to our  ability to act as an extension of our client’s product development team including:
  • Engineering
  • Marketing
  • Production
To work as a team, there must be a “meeting of the minds” in the following areas:
  • Allocate & Delegate Talent & Resources
  • Budget and Scope of the Project
  • Features and End-product Cost goals
  • Schedule & Resources
  • Development philosophy & methodology
In short:
Get together with our client and see if
there’s a fit.
Step 2
“Architecture, Specification & Planning”
Much more than just planning, this step provides a key opportunity to optimize schedules, budgets & deliverables & product cost while reducing risk:
  • BLT & our client refine the specification and identify all project elements.
  • IP and other Project elements are explored & evaluated.
  • Critical design areas such as performance/density are evaluated.
  • Sometimes test designs are implemented to determine best overall design architecture
  • BLT's MANY questions set the foundation for the project’s direction and overall quality.
Note: For complex projects and those without a firm specification, BLT may suggest this step as an independent 1st effort.
Save you money and guide you to value by
proper planning
Step 3
Design, Entry & Implementation
BLT’s formal methodology includes a high level of interaction with Clients throughout a project. Clients are always:
  • Aware of schedules and deliverables
  • Informed regarding a project’s status
  • Involved at critical points
  • Apprised and involved when a change of direction may be warranted
For more information about the BLT process, ask us about BLT’s Proprietary “Design Checklist” or consult the abbreviated version in the “BLT Company Report”
Get to work and keep the Client
"in the loop"
Step 4
Verification, Integration, & Ownership Transfer
These activities are driven by the test plan jointly developed during the entire course of the project. In this final and critical phase we solicit our Client’s involvement in the following areas:
  • Simulation
  • Subsystem Test
  • System Integration
Coincident with BLT’s role as an extension of our Client’s team, every step of the project leads to this final point:
Ownership of BLT’s facets of the project is conveyed to the Client.
Present the Client a design as if they did it
"in-house"
 
Contact  Careers   Site Map  eNewsletter Library  Links
Copyright (c) 2005 Bottom Line Technologies Inc. All rights reserved. Version 5.0 - 2008-03-01 18:18
Except as permitted under a separate written agreement with Bottom Line Technologies, neither the Bottom Line Technologies software, nor any content that appears on any Bottom Line Technologies site, including but not limited to, web pages, newsletters, or templates may be reproduced, republished, repurposed, or distributed without the prior written permission of Bottom Line Technologies Inc. For inquiries regarding reproduction or distribution of any Bottom Line Technologies material, please contact legal@bltinc.com.